The direct cost of a project with respect to normal time is minimum.
26) The direct cost of a project with respect to normal time is
Answer is:
minimum
Explanation:
Related Structural Engineering II MCQ with Answers
Answer is:
increasing the direct cost and decreasing the indirect cost
Answer is: