77) Consider the following operations : 1.Drilling 2.Blasting 3.Mucking 4.Placing steel 5.Placing concrete. The correct sequence of these operations in tunnel construction is
Answer is:
1,2,3,4,5
Related Structural Engineering II MCQ with Answers
Answer is:
9 days
Answer is: