24) The time with which direct cost does not reduce with the increase in time is known as
Answer is:
normal time
Related Structural Engineering II MCQ with Answers
Answer is:
between normal time and crash time
Answer is:
minimum
Explanation:
The direct cost of a project with respect to normal time is minimum.
Answer is: