22) What estimate would you give for the variance in above problem
Answer is:
81
Related Structural Engineering II MCQ with Answers
Answer is:
independent float
Answer is:
normal time
Answer is:
between normal time and crash time
Answer is:
minimum
Explanation:
The direct cost of a project with respect to normal time is minimum.